Have your say

Onward Homes, Hampton Developments NW and Ainsley Gommon Architects are working on plans to create a total of 33 new affordable homes across two separate sites in Beechwood.

Before we submit a planning application for both sites, we want to hear from you. Your views are important to us and will help us to shape our final plans.

To learn more about our proposals and speak to the project team, please join us for our public consultation event:

  • Where?

    The Little Centre, Fifth Avenue, Beechwood, CH43 9LB

  • When?

    Thursday 19 November 2026

  • What time?

    4pm-7pm

Our vision for Gaywood Close

For some time now, our apartment buildings at Gaywood Close and Gaytree Court have attracted a significant amount of antisocial behaviour. The decision has recently been taken to demolish Gaywood and Gaytree and replace them with new family housing that provides a greater sense of safety and security.

The few remaining residents of Gaywood Close and Gaytree Court have been informed of our decision, and we are supporting them to find alternative homes that are suitable. Demolition of the existing blocks will only take place once all residents have found alternative accommodation that meets their individual needs.

To replace the 24 one-bedroom apartments at Gaywood and Gaytree, we propose building 21 modern family homes, in a mix of two- and three-bedroom houses. All homes would have their own private gardens and a dedicated parking space.

Although this would mean a reduction in the number of homes on the site, there would be an increase in the total number of bed spaces. The redevelopment would also provide a more diverse housing mix that better reflects local housing needs.

Our vision for Bidston Green Drive (multi-use games area site)

The Multi-Use Games Area (MUGA) at Bidston Green Drive has been neglected for some time, with persistent littering, antisocial behaviour and scrub growth making it unsuitable as a continuing recreation space, especially for young people.

Our proposals would bring this underused MUGA site back into use for the local community, delivering 12 new two-bedroom homes with improved pedestrian and cycle routes.

All homes would feature off-road parking and their own private gardens.

Construction and traffic

Once we have reviewed and responded to all feedback from our consultation, we would expect to submit a planning application to Wirral Council later this year.

If our planning application is successful, we would hope to begin construction in Spring/Summer 2027, with all homes across both sites expected to complete within two years.

As part of the planning process, a traffic assessment would be carried out to identify any impact on the local traffic network from development, and to agree any measures to reduce disruption to local residents and road users.

Two construction workers in blue hard hats and hi-vis jackets adjusting an optical level on a tripod.

Environment and sustainability

As part of the planning process, we will carry out a range of environmental assessments to ensure the development is delivered responsibly and with minimal impact on the local area. These assessments will consider ecology and biodiversity, trees and any necessary protection measures, noise and air quality, and flood risk and drainage.

Where necessary, we will introduce measures to protect and enhance the local environment ensuring that wildlife habitats are preserved and that the development contributes positively to the surrounding landscape.

All of these new homes would be built to high energy efficiency standards (EPC B), featuring solar panels, electric heating systems and Electronic Vehicle (EV) charging points. These features would help reduce energy demands and ensure that homes remain affordable to run in the long term.

Close-up of hands planting a young tomato seedling into rich soil in a garden bed.

Getting involved

On Monday 16 November 2026, a two-week period of consultation will begin, giving local residents and businesses the opportunity to view our plans and share their views.

The consultation will close on Sunday 29 November, so please make sure you send us any feedback before that date.

If you're unable to attend our consultation event on 19 November, you can learn more and provide feedback by:

  • Sending us an email

    Email your questions and comments to consultation@onward.co.uk

  • Giving us a call

    If you do not have access to email, please call us on 0300 555 0600 and we can arrange for your feedback to be recorded.

An older man gestures while speaking to residents at an Onward Homes customer engagement event.

What happens next?

We are currently at the early engagement stage. Once we’ve reviewed your feedback, we will finalise our plans and submit a planning application to Wirral Council.

Nearby residents will be notified by the Council once the application is live, and you’ll have another opportunity to comment through the Council’s planning portal.

If you are ready to provide your feedback, please fill out the consultation form below.

Beechwood Consultation

Your details

Name(Required)
How would you like us to respond?(Required)
If you would like us to reply to your feedback, please provide your email address, telephone number, and/or postal address.
Address

Your feedback

Please tell us how you feel about these proposals.
How do you feel about our plans?
Please tick the box that best describes your feelings about our proposals for new homes in Beechwood.
Please tell us more about your thoughts, or feel free to ask any questions here.